TaproofCustomer portal

Separate van & forklift check sheets

Van driver sheetForklift operator sheetsDownload PDF

Standard starting templates · reviewed against DVSA and HSE guidance on 13 October 2026. Approve for each asset, manufacturer handbook and site procedure before operational use.

These sheets record an inspection and operator identity; they do not certify compliance, roadworthiness, training or physical presence. Daily checks do not replace planned maintenance or statutory examinations. For staff attendance, use the separate shared clock point.

3.5-tonne van · daily walkaround

Taproof

Review optional equipment and fuel-system checks for this particular van before approving. Remove genuinely inapplicable entries during setup; never record an unperformed check as Pass. Add model-specific instructions. Use the registration as part of the equipment name. Record who was informed and the defect assessment in fault notes. Dangerous or uncertain conditions require stop-use and direct reporting.

Company / site: __________________________

Registration / truck ID: ____________________

Driver / operator name: ____________________

Date / time / shift: ________________________

Mileage / operating hours: _________________

Reported to / time: ________________________

CheckPassFailN/A*
Mirrors, cameras and windscreen clear and secure□□□
Washers and wipers working□□□
Dashboard warning indicators checked□□□
Steering operating normally□□□
Horn working□□□
Service and parking brakes checked safely□□□
Seats and seat belts secure and undamaged□□□
Lights, indicators and brake lights working□□□
Fluid levels, filler cap and leaks checked□□□
Battery secure and undamaged□□□
Bodywork and doors secure□□□
Tyres: legal tread, pressure and damage; wheels and fixings secure□□□
Load restrained; floor and bulkhead sound□□□
AdBlue level checked where fitted□□□
Exhaust condition checked□□□
Alternative-fuel components and isolation checked where fitted□□□
Registration plates secure and legible□□□
Towbar, trailer coupling, electrics and breakaway checked where fitted□□□
Special equipment including tail lift checked where fitted□□□
Driver confirms authorised use and completed applicable checks□□□

*N/A requires a recorded reason and an agreed asset-specific checklist. The digital checklist uses Pass/Fail: remove inapplicable checks during manager configuration.

Result: □ Nil defects reported □ Defects reported □ STOP USE

Defect, assessment, N/A reasons and immediate action: ________________________________________
________________________________________________________________________________

Operator confirmation / signature: ______________________ Time: _____________________

Repair work / reference / completed by / date: _______________________________________________

Manager review / safety recheck / release decision / date: ______________________________________

Unsafe condition: stop use, follow the site procedure and report directly. A submitted form or email does not authorise return to use.

Guidance: DVSA · van daily walkaround checks. Driver defect and repair records should be retained under the applicable operator maintenance policy; DVSA roadworthiness guidance specifies at least 15 months for its defect records.

Electric forklift · pre-shift

Taproof

Use the manufacturer handbook and site procedure. Confirm truck type, battery system, attachments, operator authorisation and safe testing arrangements. This pre-shift check does not replace maintenance, safety inspections or a LOLER thorough examination.

Company / site: __________________________

Registration / truck ID: ____________________

Driver / operator name: ____________________

Date / time / shift: ________________________

Mileage / operating hours: _________________

Reported to / time: ________________________

CheckPassFailN/A*
Forks, carriage and attachments visibly serviceable□□□
Mast, chains and hydraulic components checked□□□
Tyres, applicable pressures, wheels and wheel fixings checked□□□
Overhead guard and load backrest checked□□□
Seat, restraint and operator compartment checked□□□
Steering and brakes tested in a safe area□□□
Horn, lights and fitted warning devices working□□□
Controls and instruments operating normally□□□
Lift, tilt and attachment functions tested safely□□□
Mirrors and fitted visibility aids checked□□□
Hydraulic fluid level checked per handbook; no leaks or visible damage□□□
Capacity plate legible; attachments match authorised configuration□□□
Operator confirms training, authorisation and handbook checks completed□□□
Battery charged and secured; no leaks; charger off and lead disconnected/stored□□□

*N/A requires a recorded reason and an agreed asset-specific checklist. The digital checklist uses Pass/Fail: remove inapplicable checks during manager configuration.

Result: □ Nil defects reported □ Defects reported □ STOP USE

Defect, assessment, N/A reasons and immediate action: ________________________________________
________________________________________________________________________________

Operator confirmation / signature: ______________________ Time: _____________________

Repair work / reference / completed by / date: _______________________________________________

Manager review / safety recheck / release decision / date: ______________________________________

Unsafe condition: stop use, follow the site procedure and report directly. A submitted form or email does not authorise return to use.

Guidance: HSE L117 · lift-truck pre-shift checks. Retain pre-shift and repair records under your equipment maintenance policy. Keep statutory examination records separately under the applicable requirements.

Engine forklift · pre-shift

Taproof

Configure diesel or LPG details to match the manufacturer handbook. Confirm attachments, operator authorisation and safe testing arrangements. This pre-shift check does not replace maintenance, safety inspections or a LOLER thorough examination.

Company / site: __________________________

Registration / truck ID: ____________________

Driver / operator name: ____________________

Date / time / shift: ________________________

Mileage / operating hours: _________________

Reported to / time: ________________________

CheckPassFailN/A*
Forks, carriage and attachments visibly serviceable□□□
Mast, chains and hydraulic components checked□□□
Tyres, applicable pressures, wheels and wheel fixings checked□□□
Overhead guard and load backrest checked□□□
Seat, restraint and operator compartment checked□□□
Steering and brakes tested in a safe area□□□
Horn, lights and fitted warning devices working□□□
Controls and instruments operating normally□□□
Lift, tilt and attachment functions tested safely□□□
Mirrors and fitted visibility aids checked□□□
Hydraulic fluid level checked per handbook; no leaks or visible damage□□□
Capacity plate legible; attachments match authorised configuration□□□
Operator confirms training, authorisation and handbook checks completed□□□
Fuel system, secure tank or cylinder and isolation checked□□□
Engine fluids and exhaust checked□□□

*N/A requires a recorded reason and an agreed asset-specific checklist. The digital checklist uses Pass/Fail: remove inapplicable checks during manager configuration.

Result: □ Nil defects reported □ Defects reported □ STOP USE

Defect, assessment, N/A reasons and immediate action: ________________________________________
________________________________________________________________________________

Operator confirmation / signature: ______________________ Time: _____________________

Repair work / reference / completed by / date: _______________________________________________

Manager review / safety recheck / release decision / date: ______________________________________

Unsafe condition: stop use, follow the site procedure and report directly. A submitted form or email does not authorise return to use.

Guidance: HSE L117 · lift-truck pre-shift checks. Retain pre-shift and repair records under your equipment maintenance policy. Keep statutory examination records separately under the applicable requirements.